From incoming material to container loading, every stage is documented, reviewed and signed off before the project moves forward.

  1. 1

    Gate 1 · IQC

    Incoming Raw Material

    No material enters production until its chemistry and mechanical properties match the drawing specification.

    • Spectrochemical analysis (OES / XRF)
    • Mill Test Certificate verification
    • Hardness testing
  2. 2

    Gate 2 · IPQC

    In-Process Quality Control

    Defects are caught at the station that creates them, before value is added on top.

    • First Article Inspection
    • Go/No-Go plug and thread gauges
    • Functional and fit-up checks
  3. 3

    Gate 3 · FQC

    Final Metrology & Coating

    Finished parts are measured and coating is proven before anything is packed.

    • 3D CMM multi-point validation
    • Magnetic coating thickness gauges
    • Salt-spray corrosion chamber
  4. 4

    Gate 4 · PSI

    Pre-Shipment & Container Loading

    The shipment that leaves the factory is the shipment that was approved.

    • AQL sampling, Level II
    • Packaging drop testing
    • Container balance & strapping audit

Compliant and audited. Project ready.

Our partner plants are certified to the standards European projects ask for, and every shipment travels with its quality dossier.

  • ISO 9001:2015Quality management
  • EN 1090Structural steel, CE marked
  • ISO 3834Welding quality
  • ISO 14001Environmental management

Certifications held by Argonis partner manufacturing plants. Certificates available on request.

Four gates between raw steel and your site.
GateMetrology detailsStandardRecord issued
1 · IQCIncoming Raw MaterialSpectrochemical analysis (OES / XRF)Alloy chemistry verified against the ordered grade on every heat.—Signed IQC report with MTC and OES printouts
Mill Test Certificate verificationHeat numbers matched between MTC, material stamps and purchase order.EN 10204 3.1
Hardness testingRockwell / Brinell hardness sampled per lot.—
2 · IPQCIn-Process Quality ControlFirst Article InspectionFull ballooned-drawing inspection of the first production part.AS9102First article package and inspection reports
Go/No-Go plug and thread gaugesCalibrated gauges at the machine for every critical bore and thread.—
Functional and fit-up checksAssemblies checked for function and fit against the approved design.—
3 · FQCFinal Metrology & Coating3D CMM multi-point validationCoordinate measuring machine reports on all critical dimensions.—CMM report, coating log, salt-spray certificate
Magnetic coating thickness gaugesLocal and mean zinc thickness logged per batch.EN ISO 1461
Salt-spray corrosion chamberCoupon testing of coating systems to the specified hours.ASTM B117
4 · PSIPre-Shipment & Container LoadingAQL sampling, Level IIStatistical lot acceptance before release.ISO 2859-1PSI report with photo log and seal number
Packaging drop testingPackaging proven to survive handling and ocean freight.—
Container balance & strapping auditLoad distribution, lashing and seal number photo-logged.—

Quality Assurance

Frequently asked questions

Who oversees quality during production?

Argonis project and quality engineers, not third-party brokers. They oversee first articles, inspections and container loading directly with our manufacturing partners.

What documentation do we receive?

A complete project dossier: material certificates, inspection and dimensional reports, coating records and loading records for every shipment.

How is a shipment released?

Each lot is sampled and approved against the agreed quality plan before release. Nothing is loaded until it has been signed off.

Planning a project? Let's talk.

Tell us about scope, timeline and site. Our project team responds within one business day.

Contact Our Team