Quality Assurance
Quality managed at every stage of the project.
From incoming material to container loading, every stage is documented, reviewed and signed off before the project moves forward.
- 1
Gate 1 · IQC
Incoming Raw Material
No material enters production until its chemistry and mechanical properties match the drawing specification.
- Spectrochemical analysis (OES / XRF)
- Mill Test Certificate verification
- Hardness testing
- 2
Gate 2 · IPQC
In-Process Quality Control
Defects are caught at the station that creates them, before value is added on top.
- First Article Inspection
- Go/No-Go plug and thread gauges
- Functional and fit-up checks
- 3
Gate 3 · FQC
Final Metrology & Coating
Finished parts are measured and coating is proven before anything is packed.
- 3D CMM multi-point validation
- Magnetic coating thickness gauges
- Salt-spray corrosion chamber
- 4
Gate 4 · PSI
Pre-Shipment & Container Loading
The shipment that leaves the factory is the shipment that was approved.
- AQL sampling, Level II
- Packaging drop testing
- Container balance & strapping audit
Compliant and audited. Project ready.
Our partner plants are certified to the standards European projects ask for, and every shipment travels with its quality dossier.
- ISO 9001:2015Quality management
- EN 1090Structural steel, CE marked
- ISO 3834Welding quality
- ISO 14001Environmental management
Certifications held by Argonis partner manufacturing plants. Certificates available on request.
| Gate | Metrology details | Standard | Record issued |
|---|---|---|---|
| 1 · IQCIncoming Raw Material | Spectrochemical analysis (OES / XRF)Alloy chemistry verified against the ordered grade on every heat. | — | Signed IQC report with MTC and OES printouts |
| Mill Test Certificate verificationHeat numbers matched between MTC, material stamps and purchase order. | EN 10204 3.1 | ||
| Hardness testingRockwell / Brinell hardness sampled per lot. | — | ||
| 2 · IPQCIn-Process Quality Control | First Article InspectionFull ballooned-drawing inspection of the first production part. | AS9102 | First article package and inspection reports |
| Go/No-Go plug and thread gaugesCalibrated gauges at the machine for every critical bore and thread. | — | ||
| Functional and fit-up checksAssemblies checked for function and fit against the approved design. | — | ||
| 3 · FQCFinal Metrology & Coating | 3D CMM multi-point validationCoordinate measuring machine reports on all critical dimensions. | — | CMM report, coating log, salt-spray certificate |
| Magnetic coating thickness gaugesLocal and mean zinc thickness logged per batch. | EN ISO 1461 | ||
| Salt-spray corrosion chamberCoupon testing of coating systems to the specified hours. | ASTM B117 | ||
| 4 · PSIPre-Shipment & Container Loading | AQL sampling, Level IIStatistical lot acceptance before release. | ISO 2859-1 | PSI report with photo log and seal number |
| Packaging drop testingPackaging proven to survive handling and ocean freight. | — | ||
| Container balance & strapping auditLoad distribution, lashing and seal number photo-logged. | — |
Quality Assurance
Frequently asked questions
Who oversees quality during production?
Argonis project and quality engineers, not third-party brokers. They oversee first articles, inspections and container loading directly with our manufacturing partners.
What documentation do we receive?
A complete project dossier: material certificates, inspection and dimensional reports, coating records and loading records for every shipment.
How is a shipment released?
Each lot is sampled and approved against the agreed quality plan before release. Nothing is loaded until it has been signed off.