Free tool
Know roughly what a part should cost before you ask.
Enter process, material, weight and volume. The estimator returns an indicative cost range with a breakdown, a volume curve and a check against any quote you already have.
Indicative unit cost, ex-works
€30.33 – €45.13
Midpoint €36.99 · order total ≈ €18,495
- Material
- €12.77
- Processing
- €16.92
- Finishing
- €6.60
- Setup (amortised)
- €0.70
Unit cost by order quantity
- €71.2910 pcs
- €39.79100 pcs
- €36.641,000 pcs
- €36.3210,000 pcs
Assumptions
Indicative budgeting estimate, not a quotation. Processing rates per kg are Asian manufacturing baselines scaled by complexity, tolerance and region. Material includes process scrap. Setup is spread over the order quantity. Excludes tooling, freight, duties and VAT. Real quotes depend on drawing, volume and market prices.
How it works
Three steps, no sign-up.
- 1
Describe the part
Process, material, net weight, complexity, tolerance, finish and quantity.
- 2
Parametric model
Material, processing, finishing and setup are costed from editable assumptions.
- 3
Benchmark quotes
Compare a supplier quote against the range before you negotiate.
Planning a project? Let's talk.
Tell us about scope, timeline and site. Our project team responds within one business day.
